PROJECT

Installation Project Solar Cell for Cat Hotel
10 kW, Pak Kret, Nonthaburi

Update on the 10 kW solar cell installation project in Nonthaburi at a pet hotel in Pak Kret District. Utilizing a Microinverter system for maximum safety, saving over 73,000 THB/year on electricity bills.

ผลงานติดตั้งโซล่าเซลล์ นนทบุรี โรงแรมแมว โรงแรมสัตว์เลี้ยง ขนาด 10 kW อ.ปากเกร็ด เน้นความปลอดภัยด้วย Microinverter โดย PUMA SUNERGY
Project Specification VERIFIED
Project Type
Pet Hotel / Veterinary Clinic
Installation Location
Pak Kret District, Nonthaburi
Installation Capacity
10 kW
(Total panel output 11.6 kWp)
Main Equipment
580W Panels (20 Panels)
Microinverter HM-1500 (5 Units)
Electricity Savings
≈ 6,149.86 THB/month
(≈ 73,798.27 THB/year)
*Kilowatt Peak (kWp) is the unit used to measure the maximum power output a solar panel can produce under Standard Test Conditions (STC) in a laboratory, not actual production.
It's important to note that kWp represents theoretical peak output, not actual production. In real-world operation, the actual power generated can vary significantly due to numerous factors such as: Weather conditions (e.g., cloudy, rainy), Higher panel temperature, Panel orientation and tilt, Partial shading, Panel cleanliness, Time of day.

Solar Cell Installation Project in Nonthaburi: 10 kW for Cat Hotel in Pak Kret

The PUMA SUNERGY team delivers an update on our solar energy system design and installation for a pet care service business. In this project, we were trusted to install a 10 kW solar cell system for a "Cat Hotel" in Pak Kret District, Nonthaburi Province.

For pet hotels, veterinary clinics, or pet shops, the top priority is the well-being of the pets. It is necessary to run air conditioning systems 24 hours a day to prevent heatstroke and ensure proper ventilation. Installing solar panels is therefore the best solution to leverage solar energy to offset electricity costs during the daytime, which is the period when the weather is hot and air conditioners consume the most power.

Safe for Structures and Pets with the Microinverter System  

Safety is the core heart of pet care facilities. The engineering team has therefore chosen to install top-specification equipment for the business owner's peace of mind:

  • 580W Solar Panels (20 Panels): Achieves a total output of up to 11.6 kWp, which is sufficient to support multiple air conditioners running simultaneously.
  • Inverter Model HM-1500 (5 Units): We chose to utilize Microinverter technology, which features ultimate safety as its highlight. Since it prevents the accumulation of high Direct Current (DC) voltage on the roof, it decisively eliminates fire hazards or electrical short circuits, giving business owners and customers 100% confidence in pet safety.

How Much Can a 10 kW Pet Hotel Solar Cell Installation Save on Electricity Bills?  

With a system design tailored to electricity consumption behavior, this project can generate an average of 1,308 units (kWh) of electricity per month for usage, excellently saving business costs:

  • Reduce monthly electricity costs: Saves approximately 6,149.86 THB
  • Reduce annual electricity costs: Saves up to 73,798.27 THB

When evaluating the savings figures alongside the investment budget, the payback period will be approximately 3.5 - 4 years. After that, the system will continue to generate profit by reducing hidden costs for the business for over 20 years.

Break-even Point (ROI) Estimation Graph for 10 kW Project 

Cumulative Value (THB) Time (Years) 10 kW Installation Cost Cumulative Energy Savings Profit Zone Break-even ~3.5 - 4 Years Year 1 Year 2 Year 3 Year 4 Year 5

Estimated Break-even Point based on projected savings of ≈ 73,798 THB/year

If you are a business owner of a pet hotel, veterinary clinic, or dog and cat cafe, you can try to calculate the initial break-even point and solar panel size for your shop for free right here. Or, if you are interested in viewing projects in other similar-sized business sectors, you can view the 12 kW Cafe Solar Cell Installation Project in Samut Prakan for more details.

Free Consultation and On-Site Assessment with PUMA SUNERGY  

Our engineering team is ready to provide advice and design the system that best suits your business. Check the initial installation package price details or contact our sales department on any day.

Tel: 061-6479393

LINE OA: Click 👉 https://lin.ee/TwdVWJ8